Design Management: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
| Line 9: | Line 9: | ||
| duration = 4:00 | | duration = 4:00 | ||
| updated = April 2026 | | updated = April 2026 | ||
| summary = How to bring drawings into PRS from PDF or | | summary = How to bring drawings into PRS from PDF or Logikal, break them into packets using pre-configured templates, approve them, and process them through to the factory's Manufacturing Status screen. | ||
| videofile = 1. PRS - Design Management - Getting Drawings into the Factory.mp4 | | videofile = 1. PRS - Design Management - Getting Drawings into the Factory.mp4 | ||
| transcript = | | transcript = | ||
<div class="ts-entry" data-time="0"><span class="ts-time">0:00</span> <span class="ts-text">Adding drawings and assigning a job number.</span></div> | <div class="ts-entry" data-time="0"><span class="ts-time">0:00</span> <span class="ts-text">Adding drawings and assigning a job number.</span></div> | ||
<div class="ts-entry" data-time="34"><span class="ts-time">0:34</span> <span class="ts-text">Pulling drawings from a PDF or | <div class="ts-entry" data-time="34"><span class="ts-time">0:34</span> <span class="ts-text">Pulling drawings from a PDF or Logikal.</span></div> | ||
<div class="ts-entry" data-time="62"><span class="ts-time">1:02</span> <span class="ts-text">Using packets to route drawings to the factory.</span></div> | <div class="ts-entry" data-time="62"><span class="ts-time">1:02</span> <span class="ts-text">Using packets to route drawings to the factory.</span></div> | ||
<div class="ts-entry" data-time="104"><span class="ts-time">1:44</span> <span class="ts-text">Creating production packets from pre-configured PRS templates.</span></div> | <div class="ts-entry" data-time="104"><span class="ts-time">1:44</span> <span class="ts-text">Creating production packets from pre-configured PRS templates.</span></div> | ||
| Line 20: | Line 20: | ||
| keypoints =<br> | | keypoints =<br> | ||
* Drawings are added via the plus icon and tagged with a job number. | * Drawings are added via the plus icon and tagged with a job number. | ||
* Drawings can come from a PDF or directly from | * Drawings can come from a PDF or directly from Logikal. | ||
* Packets group drawings into discrete manufacturing tasks. | * Packets group drawings into discrete manufacturing tasks. | ||
* Packet templates are pre-configured in Manufacturing Status setup. | * Packet templates are pre-configured in Manufacturing Status setup. | ||
| Line 29: | Line 29: | ||
* [[Related Page Two]] | * [[Related Page Two]] | ||
}} | }} | ||
Latest revision as of 01:41, 24 April 2026
| PRS Version | Not specified |
|---|
Overview
How to bring drawings into PRS from PDF or Logikal, break them into packets using pre-configured templates, approve them, and process them through to the factory's Manufacturing Status screen.
✓ Key Points
- Drawings are added via the plus icon and tagged with a job number.
- Drawings can come from a PDF or directly from Logikal.
- Packets group drawings into discrete manufacturing tasks.
- Packet templates are pre-configured in Manufacturing Status setup.
- Drawings must be approved before they can be processed.
- Processing sends the packets into the factory's Manufacturing Status.
📋 Transcript Click any line to jump
0:00 Adding drawings and assigning a job number.
0:34 Pulling drawings from a PDF or Logikal.
1:02 Using packets to route drawings to the factory.
1:44 Creating production packets from pre-configured PRS templates.
2:50 Approving a drawing before processing it.
3:12 Processing pushes drawings into the factory.
| Version | Not specified |
|---|
Overview
No summary provided.
| Training Video | |
|---|---|
| Transcript | No transcript available. |
Drawing Upload and Evaluation
No summary provided.
Packet Creation
No summary provided.
| See Also | No related pages. |
|---|