Design Management: Difference between revisions
Jump to navigation
Jump to search
m No need for showcase of images |
No edit summary |
||
| Line 1: | Line 1: | ||
{| class="wikitable" width="20%" cellpadding="8" | |||
|- | |||
! PRS Version | |||
| {{{version|Not specified}}} | |||
|} | |||
{{TrainingVideo | |||
| title = Design Management - Getting Drawings into the Factory | |||
| module = Design Management | |||
| duration = 4:00 | |||
| updated = April 2026 | |||
| summary = How to bring drawings into PRS from PDF or Logical, break them into packets using pre-configured templates, approve them, and process them through to the factory's Manufacturing Status screen. | |||
| videofile = 1. PRS - Design Management - Getting Drawings into the Factory.mp4 | |||
| transcript = | |||
<div class="ts-entry" data-time="0"><span class="ts-time">0:00</span> <span class="ts-text">Adding drawings and assigning a job number.</span></div> | |||
<div class="ts-entry" data-time="34"><span class="ts-time">0:34</span> <span class="ts-text">Pulling drawings from a PDF or Logical.</span></div> | |||
<div class="ts-entry" data-time="62"><span class="ts-time">1:02</span> <span class="ts-text">Using packets to route drawings to the factory.</span></div> | |||
<div class="ts-entry" data-time="104"><span class="ts-time">1:44</span> <span class="ts-text">Creating production packets from pre-configured PRS templates.</span></div> | |||
<div class="ts-entry" data-time="170"><span class="ts-time">2:50</span> <span class="ts-text">Approving a drawing before processing it.</span></div> | |||
<div class="ts-entry" data-time="192"><span class="ts-time">3:12</span> <span class="ts-text">Processing pushes drawings into the factory.</span></div> | |||
| keypoints =<br> | |||
* Drawings are added via the plus icon and tagged with a job number. | |||
* Drawings can come from a PDF or directly from Logical. | |||
* Packets group drawings into discrete manufacturing tasks. | |||
* Packet templates are pre-configured in Manufacturing Status setup. | |||
* Drawings must be approved before they can be processed. | |||
* Processing sends the packets into the factory's Manufacturing Status. | |||
| seealso =<br> | |||
* [[Related Page One]] | |||
* [[Related Page Two]] | |||
}} | |||
{| class="wikitable" width="40%" cellpadding="8" | {| class="wikitable" width="40%" cellpadding="8" | ||
|- | |- | ||
Revision as of 08:52, 23 April 2026
| PRS Version | Not specified |
|---|
Overview
How to bring drawings into PRS from PDF or Logical, break them into packets using pre-configured templates, approve them, and process them through to the factory's Manufacturing Status screen.
✓ Key Points
- Drawings are added via the plus icon and tagged with a job number.
- Drawings can come from a PDF or directly from Logical.
- Packets group drawings into discrete manufacturing tasks.
- Packet templates are pre-configured in Manufacturing Status setup.
- Drawings must be approved before they can be processed.
- Processing sends the packets into the factory's Manufacturing Status.
📋 Transcript Click any line to jump
0:00 Adding drawings and assigning a job number.
0:34 Pulling drawings from a PDF or Logical.
1:02 Using packets to route drawings to the factory.
1:44 Creating production packets from pre-configured PRS templates.
2:50 Approving a drawing before processing it.
3:12 Processing pushes drawings into the factory.
| Version | Not specified |
|---|
Overview
No summary provided.
| Training Video | |
|---|---|
| Transcript | No transcript available. |
Drawing Upload and Evaluation
No summary provided.
Packet Creation
No summary provided.
| See Also | No related pages. |
|---|